...
首页> 外文期刊>Data in Brief >Data on factors influencing the cost, time performance of the Industrialized Building System
【24h】

Data on factors influencing the cost, time performance of the Industrialized Building System

机译:有关影响工业化建筑系统成本,时间性能的因素的数据

获取原文
           

摘要

The data article provides the factors that influence the cost; time performance of the Industrialized Building System (IBS), its prospects and challenges. A survey technique was used for this research. Structured Questionnaires were administered to occupants of prefabricated buildings and interviews were conducted with the professionals in the building industry. Statistical Package for Social Sciences (SPSS version20) was used to analyse the data obtained from the questionnaires. The variables were ranked based on Relative Importance Index (RII) calculation. The Data indicated that IBS would be more economical if used for mass production.
机译:数据文章提供了影响成本的因素;工业化建筑系统(IBS)的时间性能,前景和挑战。一项调查技术被用于这项研究。对预制房屋的居民进行了结构化问卷调查,并与建筑行业的专业人员进行了访谈。社会科学统计软件包(SPSS版本20)用于分析从问卷中获得的数据。根据相对重要性指数(RII)计算对变量进行排名。数据表明,如果用于大量生产,IBS将更加经济。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号