首页> 外文期刊>Technologies >A New Control Chart for Monitoring the Process Mean Using Successive Sampling and Multiple Dependent State Repetitive Sampling
【24h】

A New Control Chart for Monitoring the Process Mean Using Successive Sampling and Multiple Dependent State Repetitive Sampling

机译:使用连续采样和多依存状态重复采样监控过程均值的新控制图

获取原文
       

摘要

In this paper, a new control chart scheme has been developed for monitoring the production process mean using successive sampling over two occasions. The proposed chart reduces to three different existing control charts under different assumptions and is compared with these three existing control charts for monitoring the process average. It has been observed that the proposed control chart performs better than the other existing control charts in terms of average run length ( ARL ). A simulation study using an artificial data set was included for demonstrating the process shift detection power of the proposed control chart.
机译:在本文中,已经开发了一种新的控制图方案,用于通过两次连续采样来监视生产过程的平均值。拟议的图表在不同的假设下简化为三个不同的现有控制图,并与这三个现有的控制图进行比较以监控过程平均值。已经观察到,就平均行程长度(ARL)而言,所提出的控制图的性能优于其他现有控制图。包括使用人工数据集进行的仿真研究,以证明所提出的控制图的过程偏移检测能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号