...
首页> 外文期刊>Underground Space >Robustness evaluation of cutting tool maintenance planning for soft ground tunneling projects
【24h】

Robustness evaluation of cutting tool maintenance planning for soft ground tunneling projects

机译:软土地基隧道工程刀具维修计划的稳健性评估

获取原文
   

获取外文期刊封面封底 >>

       

摘要

Tunnel boring machines require extensive maintenance and inspection effort to provide a high availability. The cutting tools of the cutting wheel must be changed timely upon reaching a critical condition. While one possible maintenance strategy is to change tools only when it is absolutely necessary, tools can also be changed preventively to avoid further damages. Such different maintenance strategies influence the maintenance duration and the overall project performance. However, determine downtime related to a particular maintenance strategy is still a challenging task. This paper shows an analysis of the robustness to achieve the planned project performance of a maintenance strategy considering uncertainties of wear behavior of the cutting tools. A simulation based analysis is presented, implementing an empirical wear prediction model. Different strategies of maintenance planning are compared by performing a parameter variation study including Monte-Carlo simulations. The maintenance costs are calculated and evaluated with respect to their robustness. Finally, an improved and robust maintenance strategy has been determined.
机译:隧道掘进机需要大量维护和检查工作才能提供高可用性。切割轮的切割工具在达到临界状态时必须及时更换。虽然一种可能的维护策略是仅在绝对必要时才更换工具,但也可以预防性地更换工具以避免进一步损坏。这种不同的维护策略会影响维护时间和整个项目的性能。但是,确定与特定维护策略相关的停机时间仍然是一项艰巨的任务。本文显示了一种在考虑到切削工具磨损行为的不确定性的情况下对实现维护策略的计划项目性能的鲁棒性的分析。提出了基于仿真的分析,实现了经验磨损预测模型。通过执行包括蒙特卡洛模拟在内的参数变化研究,比较了不同的维护计划策略。计算和评估维护成本的可靠性。最后,已经确定了一种改进的且健壮的维护策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号