...
首页> 外文期刊>Production >An integrated approach of sustainable procurement and procurement postponement for the multi-product, assemble-to-order (ATO) production system
【24h】

An integrated approach of sustainable procurement and procurement postponement for the multi-product, assemble-to-order (ATO) production system

机译:可持续采购和延迟采购的多产品按订单组装(ATO)生产系统的集成方法

获取原文

摘要

Postponement strategy is mainly used to handle the perceived variety and actual variety of product in the most cost effective way. However, postponement strategy has never been used by researchers in procurement to reduce cost and to enhance overall flexibility of the process. This paper gives a new concept of postponement, called procurement postponement, which is considered to be effective for the multi-product, assemble-to-order (ATO) system. A two-stage integrated approach of sustainable procurement and postponement method is proposed for the multi-product ATO production system to deal demand uncertainty, green house gas (GHG) emission, reliability of supply, level of disassembly and social issues of supplier selection with intuitionsitic fuzzy analytic hierarchy (IF-AHP) and multi-objective genetic algorithm (MOGA). Case study of an Indian company is discussed to use the proposed method by cost-emission-decision matrix.
机译:推迟策略主要用于以最具成本效益的方式处理产品的感知品种和实际品种。但是,研究人员从未在采购中使用过延迟策略来降低成本并增强流程的整体灵活性。本文提出了一种新的推迟概念,即采购推迟,它被认为对多产品按订单组装(ATO)系统有效。针对多产品ATO生产系统,提出了两阶段可持续采购与延期集成的方法,以解决需求不确定性,温室气体(GHG)排放,供应可靠性,拆卸水平和供应商选择的社会问题。模糊层次分析法(IF-AHP)和多目标遗传算法(MOGA)。讨论了一家印度公司的案例研究,以成本-成本-决策矩阵为基础使用所提出的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号