...
首页> 外文期刊>PCI journal >Design-Build Replacement Bridge for St. George Island Protects the Environment and Ensures Durability
【24h】

Design-Build Replacement Bridge for St. George Island Protects the Environment and Ensures Durability

机译:圣乔治岛的设计建造替换桥保护环境并确保耐用性

获取原文
           

摘要

style="text-align: left;">A 4. 1 mile (6.6 km) long, precast, prestressed concrete replacement bridge, belonging to the Florida Department of Transportation (FDOT), was built to provide mainland access to the barrier island  of St. George in the Gulf of Mexico. The $73.4 million bridge is needed to accommodate sensitive environmental restrictions and must provide a 75- year service life with quality production and erection processes for a 10-year warranty from the design-build team. At the time of construction, the two-lane St. George Island Bridge was the single largest design-build project undertaken by the FDOT and when completed in 2004, the 1180 ft (360 m) long, five-span continuous channel span was the longest spliced girder crossing in the United States. In this article, the authors discuss the major advantages  of the design-build approach, the innovative concepts used in the project - including spun-cast cylindrical piles, a new precast concrete bent cap-to-pile connection, stay-in-place precast concrete footing  forms, and bulb tee girders - and how precast concrete design ingenuity led to rapid construction and maximum span lengths while protecting the marine ecosystem. >References style="text-align: left;">1. AASHTO, LFRD Bridge Design Specifications, Second Edition, American Association of State Highway and Transportation Officials, Washington, DC, 1998. style="text-align: left;">2. AASHTO, Standard Specifications  for Highway Bridges, 16th Edition, American Association of State Highway and Transportation Officials, Washington, DC, 1996. style="text-align: left;">3. Issa, Moussa A., a€?Testing of Pile-to-Pile Cap Moment Connection for 30 in. Prestressed Concrete Pipe-Pile,a€? FDOT Report No. 98-9, Tallahassee, FL.  
机译:style =“ text-align:left;”>建造了一个4. 1英里(6.6公里)长的预制预应力混凝土替换桥,该桥属于佛罗里达州交通运输部(FDOT),旨在为大陆提供通往该公路的通道。墨西哥湾圣乔治屏障岛。这座耗资7,340万美元的桥梁需要适应敏感的环境限制,并且必须提供75年的使用寿命以及优质的生产和安装过程,并获得设计建造团队的10年保修。在施工时,两车道的圣乔治岛大桥是FDOT进行的最大的设计建造项目,2004年完工时,长1180英尺(360 m),五跨连续通道的跨度为美国最长的拼接大梁穿越。在本文中,作者讨论了设计建造方法的主要优点,项目中使用的创新概念-包括圆筒形离心桩,新的预制混凝土弯曲帽盖-桩连接,现浇预制件混凝土立脚形式,球座三通梁-预制混凝土设计的独创性如何在保护海洋生态系统的同时快速建造和最大跨度。 >参考 style =“ text-align:left;”> 1。 AASHTO,《 LFRD桥梁设计规范》,第二版,美国国家公路和运输官员协会,华盛顿特区,1998年。 style =“ text-align:left;”> 2。 AASHTO,《公路桥梁标准规范》,第16版,美国国家公路和运输官员协会,华盛顿特区,1996年。 style =“ text-align:left;”> 3。 Issa,Moussa A.,a?30英寸预应力混凝土管桩的桩对桩帽盖矩连接的测试,a? FDOT第98-9号报告,佛罗里达州塔拉哈西。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号