首页> 外文期刊>Symmetry >A Novel Calculation Method of Process Load for Extra-Large Section Tunnels
【24h】

A Novel Calculation Method of Process Load for Extra-Large Section Tunnels

机译:大断面隧道过程荷载的一种新计算方法

获取原文
           

摘要

The calculation of load and surrounding rock pressure of extra-large-section tunnels serves as an important premise for the design and construction of tunnel projects with extra-large sections. Based on the large-span section of the Shenzhen Liantang Tunnel (China), which is the largest highway tunnel in the world to date, this paper discusses the challenges existing in the calculation method of state load and surrounding rock pressure for extra-large-section tunnels and puts forward a novel calculation method for process load, which is suitable for extra-large-section highway tunnels. In the current work, we derived the related application correlations and improved the specific application steps, methods, and project models of the proposed calculation method. Both the rationality and feasibility of the calculation method were verified from a practical perspective by comparing the on-site data of surrounding rock pressure at the Liantang Tunnel with the calculated load, which provides a fundamental basis for the process design of tunnels.
机译:特大型断面隧道的荷载和围岩压力的计算,为特大型断面隧道工程的设计和施工提供了重要前提。本文以迄今为止世界上最大的公路隧道-深圳莲塘隧道(中国)的大跨度段为基础,讨论了超大地基状态荷载和围岩压力计算方法所面临的挑战。断面隧道,提出了一种新的过程荷载计算方法,适用于超大断面公路隧道。在当前的工作中,我们推导了相关的应用程序相关性,并改进了所提出的计算方法的特定应用程序步骤,方法和项目模型。通过对连塘隧道围岩压力的现场数据与计算的荷载进行比较,从实际角度验证了该计算方法的合理性和可行性,为隧道的工艺设计提供了基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号