首页> 外文期刊>Sustainability >Risk Evaluation of a UHV Power Transmission Construction Project Based on a Cloud Model and FCE Method for Sustainability
【24h】

Risk Evaluation of a UHV Power Transmission Construction Project Based on a Cloud Model and FCE Method for Sustainability

机译:基于云模型和FCE方法的特高压输电建设项目可持续性风险评估

获取原文
           

摘要

In order to achieve the sustainable development of energy, Ultra High Voltage (UHV) power transmission construction projects are being established in China currently. Their high-tech nature, the massive amount of money involved, and the need for multi-agent collaboration as well as complex construction environments bring many challenges and risks. Risk management, therefore, is critical to reduce the risks and realize sustainable development of projects. Unfortunately, many traditional risk assessment methods may not perform well due to the great uncertainty and randomness inherent in UHV power construction projects. This paper, therefore, proposes a risk evaluation index system and a hybrid risk evaluation model to evaluate the risk of UHV projects and find out the key risk factors. This model based on a cloud model and fuzzy comprehensive evaluation (FCE) method combines the superiority of the cloud model for reflecting randomness and discreteness with the advantages of the fuzzy comprehensive evaluation method in handling uncertain and vague issues. For the sake of proving our framework, an empirical study of “Zhejiang-Fuzhou” UHV power transmission construction project is presented. As key contributions, we find the risk of this project lies at a “middle” to “high” level and closer to a “middle” level; the “management risk” and “social risk” are identified as the most important risk factors requiring more attention; and some risk control recommendations are proposed. This article demonstrates the value of our approach in risk identification, which seeks to improve the risk control level and the sustainable development of UHV power transmission construction projects.
机译:为了实现能源的可持续发展,目前在中国正在建立超高压输电建设项目。它们的高科技性质,涉及的大量资金以及对多主体协作的需求以及复杂的构建环境带来了许多挑战和风险。因此,风险管理对于降低风险和实现项目的可持续发展至关重要。不幸的是,由于特高压电力建设项目固有的巨大不确定性和随机性,许多传统的风险评估方法可能效果不佳。因此,本文提出了一种风险评估指标体系和一种混合风险评估模型,用于评估特高压项目的风险并找出关键的风险因素。该模型基于云模型和模糊综合评价(FCE)方法,结合了反映随机性和离散性的云模型的优势以及模糊综合评价方法在处理不确定性和模糊性问题上的优势。为了证明我们的框架,提出了“浙福”特高压输电建设项目的实证研究。作为主要贡献,我们发现该项目的风险处于“中等”到“高”级别,并且接近“中等”级别; “管理风险”和“社会风险”被确定为需要更多关注的最重要的风险因素;并提出了一些风险控制建议。本文展示了我们的方法在风险识别中的价值,该方法旨在提高特高压输电建设项目的风险控制水平和可持续发展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号