...
首页> 外文期刊>Energies >Project Management for a Wind Turbine Construction by Applying Fuzzy Multiple Objective Linear Programming Models
【24h】

Project Management for a Wind Turbine Construction by Applying Fuzzy Multiple Objective Linear Programming Models

机译:应用模糊多目标线性规划模型的风电建设项目管理

获取原文
   

获取外文期刊封面封底 >>

       

摘要

Meeting the demand of energy is a challenge for many countries these days, and generating electricity from renewable resources has become a main trend for future economic development. The construction of a renewable energy plant is costly and timely; therefore, a good project management model is essential. In this paper, a fuzzy multiple objective linear programming (FMOLP) model is constructed based on program evaluation and review technique (PERT) first. With the consideration of the different degrees of importance of the multiple objectives, a fuzzy multiple weighted-objective linear programming (FMWOLP) model is constructed next. Through each proposed model, a compromise solution can be devised to maximize the total degree of satisfaction while considering multiple objectives. The results can provide references for the management on what activities and how long these activities should be crashed, how much the total project cost should be, and how long the total project duration time should be. Finally, the proposed models are applied to a case study of a wind turbine construction in Taiwan.
机译:如今,满足能源需求已成为许多国家的挑战,而利用可再生资源发电已成为未来经济发展的主要趋势。可再生能源工厂的建设既昂贵又及时;因此,良好的项目管理模型至关重要。本文首先基于程序评估和评审技术(PERT)构建了模糊多目标线性规划(FMOLP)模型。考虑到多目标重要性的不同程度,接下来构建模糊多加权目标线性规划(FMWOLP)模型。通过每个提出的模型,可以设计一个折衷解决方案,以在考虑多个目标的同时最大程度地提高总体满意度。结果可以为管理提供参考,以指导哪些活动应该崩溃以及这些活动应该崩溃多长时间,项目总成本应该多少以及项目总持续时间应该多长时间。最后,将所提出的模型应用于台湾某风力涡轮机建设的案例研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号