Simulation of Automated Warehouse System: Using CPM and PERT Method

机译:自动化仓库系统仿真:使用CPM和PERT方法

获取原文
           

摘要

PERT and CPM are two most widely used method for project management. PERT use probabilistic time estimation for project completion, on the other hand CPM employs deterministic time for crashing project. Specific deadline can be achieved by crashing which is basically a time-cost trade-off. The traditional method of crashing only considers average activity times for the calculation of the critical path, ignoring the stochastic nature of activity time. Here a stochastic simulation is done to evaluate the PERT. And frequencies of project completion time in different simulation length are presented. A linear program is developed for crashing the project to minimize the required cost while attaining a specified completion time.
机译:PERT和CPM是项目管理中使用最广泛的两种方法。 PERT使用概率时间估计来完成项目,另一方面,CPM使用确定性时间来进行崩溃项目。崩溃可以实现特定的截止日期,这基本上是时间成本的折衷方案。传统的崩溃方法只考虑平均活动时间来计算关键路径,而忽略了活动时间的随机性。在这里进行了随机仿真以评估PERT。并给出了不同仿真长度下项目完成时间的频率。开发了一个线性程序来使项目崩溃,以在达到指定的完成时间的同时将所需的成本降至最低。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号