首页> 外文期刊>Engineering Technology and Applied Science Research >Common Factors of Cost Escalation in Construction Industry of Pakistan
【24h】

Common Factors of Cost Escalation in Construction Industry of Pakistan

机译:巴基斯坦建筑业成本上涨的共同因素

获取原文
       

摘要

Cost escalation is a ubiquitous problem, especially in Government organizations. Though bigger projects encompass escalation cost, in smaller projects, it is generally ignored. Several internal and external factors are responsible for the undesirably increased cost of a project. Among them some are tangible, and some are intangible. The scope of this study is to highlight most common remittable and non-remittable factors responsible for cost escalations. Thirty most common factors responsible were listed. A survey was done in order to have the stakeholder’s opinion on identifying the most common factors. Out of 102 generally identified escalating factors, 30 factors were shortlisted based on literature and initial study. Participants responded on a 1 to 5 Likert’s scale. Out of 200 distributed questionnaires, 52 reliable set of questionnaires were selected for data analysis. Clients, consultants, and constructors were selected from different projects like roads, structure, public amenities etc. Minimum threshold to participate in the survey was that a respondent must had at least a Diploma or Bachelor’s degree in the field of civil engineering. Results highlighted that financial problems, slow payments, and inflation are the top-ranked identified factors responsible for cost escalation in the construction industry of Pakistan. The weighted average of all factors ranges between 0.355 and 0.688, having 0.668, 0.629 and 0.625 for the top three factors.
机译:成本上升是一个普遍存在的问题,尤其是在政府组织中。尽管较大的项目包含升级成本,但在较小的项目中,通常将其忽略。几个内部和外部因素是导致项目成本意外增加的原因。其中有些是有形的,有些是无形的。本研究的范围是强调导致成本上升的最常见的可汇款和不可汇款因素。列出了三十种最常见的因素。进行了一项调查,以使利益相关者对确定最常见的因素有意见。根据文献和初步研究,在102个公认的逐步升级因素中,有30个因素入围。参与者以李克特的1-5分进行了回答。从200份分发的问卷中,选择52份可靠的问卷进行数据分析。客户,顾问和建筑商是从道路,建筑,公共设施等不同项目中选出的。参与调查的最低门槛是受访者必须至少具有土木工程领域的文凭或学士学位。结果突出表明,财务问题,付款缓慢和通货膨胀是导致巴基斯坦建筑业成本上涨的最主要因素。所有因子的加权平均值在0.355和0.688之间,前三个因子分别为0.668、0.629和0.625。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号