Productivity Management of Road Construction in Thailand by EZStrobe Simulation System Case Study: 0.15 m. Thick Subbase Course Construction

机译:EZStrobe仿真系统在泰国道路建设中的生产力管理案例研究:0.15 m。厚底层课程建设

获取原文
       

摘要

This research’s objectives were to conduct a work study of subbase course of road construction and implement productivity analysis with EZStrobe simulation system. The study had divided construction process into 3 parts. Each part of the process was simulated with EZStrobe to find optimum construction team members with minimum unit cost. These optimum team members were used in simulation model of each part to determine basic time with 95% confident interval and 5% limit of error. Then, the standard time and productivity of each construction team was calculated in various units; production per hour (cu.m./hr., sq.m./hr.), daily production (cu.m./day, sq.m./day, m. of road/day), and number of hour required per section of subbase course construction (200 m. in length). After that, the overall process simulation model including Part1 to Part3 was created, representing for all 26 sections of subbase course construction. The analysis results showed that optimum team combination of Team1, Team2 and Team3 for the minimum unit cost of subbase construction was 2-1-2; and for the minimum duration of construction was 3-2-3. The outcomes of this research pointed out that, with EZStrobe simulation system, the productivity management could be done effectively by conducting work study at project site and simulating for alternative resources management plan to determine for optimum construction teams according to the desired project goals. (77 views)
机译:这项研究的目的是对道路建设的基础课程进行工作研究,并使用EZStrobe仿真系统实施生产率分析。该研究将施工过程分为三个部分。使用EZStrobe模拟了过程的每个部分,以最小的单位成本找到了最佳的施工团队成员。这些最佳团队成员用于每个零件的仿真模型中,以95%的置信区间和5%的误差极限确定基本时间。然后,以不同单位计算每个施工团队的标准时间和生产率。每小时产量(立方米/小时,平方米/小时),每日产量(立方米/天,平方米/天,公路/天)和小时数每个基础层课程的建设要求(长度200 m)。之后,创建了包括Part1到Part3的整个过程仿真模型,该模型代表了基础课程建设的所有26个部分。分析结果表明,Team1,Team2和Team3的最佳团队组合对于子基板的最小单位成本为2-1-2;且最短施工时间为3-2-3。这项研究的结果指出,使用EZStrobe模拟系统,可以通过在项目现场进行工作研究并模拟替代资源管理计划来根据所需的项目目标确定最佳的施工团队,从而有效地完成生产率管理。 (77观看次数)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号