首页> 外文期刊>Einstein (So Paulo) >Return on Scientific Investment – RoSI: a PMO dynamical index proposal for scientific projects performance evaluation and management
【24h】

Return on Scientific Investment – RoSI: a PMO dynamical index proposal for scientific projects performance evaluation and management

机译:科学投资回报率-RoSI:用于科学项目绩效评估和管理的PMO动态指数建议

获取原文
       

摘要

OBJECTIVE: To propose a measure (index) of expected risks to evaluate and follow up the performance analysis of research projects involving financial and adequate structure parameters for its development. METHODS: A ranking of acceptable results regarding research projects with complex variables was used as an index to gauge a project performance. In order to implement this method the ulcer index as the basic model to accommodate the following variables was applied: costs, high impact publication, fund raising, and patent registry. The proposed structured analysis, named here as RoSI (Return on Scientific Investment) comprises a pipeline of analysis to characterize the risk based on a modeling tool that comprises multiple variables interacting in semi-quantitatively environments. RESULTS: This method was tested with data from three different projects in our Institution (projects A, B and C). Different curves reflected the ulcer indexes identifying the project that may have a minor risk (project C) related to development and expected results according to initial or full investment. CONCLUSION: The results showed that this model contributes significantly to the analysis of risk and planning as well as to the definition of necessary investments that consider contingency actions with benefits to the different stakeholders: the investor or donor, the project manager and the researchers.
机译:目的:提出一种预期风险的度量(指数),以评估和跟踪研究项目的绩效分析,该研究涉及财务和适当的结构参数以供其开发。方法:对具有复杂变量的研究项目的可接受结果进行排名,以此作为衡量项目绩效的指标。为了实施该方法,采用溃疡指数作为适应以下变量的基本模型:成本,高影响力出版物,资金募集和专利注册。拟议的结构化分析(此处称为RoSI(科学投资回报)​​)包括基于建模工具的分析流水线,以描述风险特征,该模型工具包含在半定量环境中相互作用的多个变量。结果:该方法已用我们机构中三个不同项目(项目A,B和C)的数据进行了测试。不同的曲线反映了溃疡指数,这些溃疡指数根据初始或全部投资确定了与开发和预期结果有关的可能具有较小风险的项目(项目C)。结论:结果表明,该模型对风险和计划的分析以及考虑应急措施而对不同利益相关者(投资者或捐赠者,项目经理和研究人员)都有好处的必要投资的定义做出了重要贡献。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号