首页> 外文期刊>International Scholarly Research Notices >Finite BufferGI/M(n)/1Queue with Bernoulli-Schedule Vacation Interruption underN-Policy
【24h】

Finite BufferGI/M(n)/1Queue with Bernoulli-Schedule Vacation Interruption underN-Policy

机译:N策略下带有Bernoulli-Schedule假期中断的有限BufferGI / M(n)/ 1Queue

获取原文
       

摘要

We study a finite bufferN-policyGI/M(n)/1 queue with Bernoulli-schedule vacation interruption. The server works with a slower rate during vacation period. At a service completion epoch during working vacation, if there are at leastNcustomers present in the queue, the server interrupts vacation and otherwise continues the vacation. Using the supplementary variable technique and recursive method, we obtain the steady state system length distributions at prearrival and arbitrary epochs. Some special cases of the model, various performance measures, and cost analysis are discussed. Finally, parameter effect on the performance measures of the model is presented through numerical computations.
机译:我们研究了带有Bernoulli计划休假中断的有限缓冲区N-policyGI / M(n)/ 1队列。在假期期间,服务器以较低的速率工作。在工作休假期间的服务完成时期,如果队列中至少存在N个客户,则服务器会中断休假,否则继续休假。使用补充变量技术和递归方法,我们获得了到达前和任意时期的稳态系统长度分布。讨论了模型的一些特殊情况,各种性能度量和成本分析。最后,通过数值计算得出了参数对模型性能指标的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号