Project Delays in the Malaysian Public Sector: Causes, Pathogens and the Supply Chain Management Approach

机译:马来西亚公共部门的项目延误:原因,病原体和供应链管理方法

获取原文
           

摘要

The inability to complete a project before its deadline has been a severe dilemma in Malaysian public sector projects. Despite initiatives introduced by the government to improve performance, few positive outcomes have been achieved due to inappropriate implementation and a lack of contemporary approaches. Past methods in delay studies have also fallen short in identifying the underlying causes of delays; thus, delay has remained an incessant phenomenon. Thus, this study was conducted in an attempt to shed light on the current delay scenario, taking the “pathogen” approach in identifying the very root of the causes of delay in an effort to propose a way forward for its mitigation via a contemporary approach known as Supply Chain Management (SCM). The research design that was adopted involved three stages. The first stage was an identification of factors that cause delay, whereby six industry experts with a minimum of 20 years of experience were interviewed to gain their insight on this matter. Then, the factors were grouped into pathogens and pathogen sub-categories using a concept taken from other prominent research that took a similar research approach. The third and final stage involved matching beneficial SCM tools that were carefully selected from a literature review that had the potential to overcome each of the delay pathogens and pathogen sub-categories. The conceptual framework, as concluded by this research, provides a thorough overview of the delay factors, pathogens, and pathogen sub-categories, as well as the available tools via SCM that could be used to overcome these issues. It is anticipated that this framework will lead to better time management in future Malaysian public sector construction projects.
机译:在马来西亚的公共部门项目中,无法在截止日期之前完成项目是一个严重的难题。尽管政府提出了提高绩效的举措,但由于实施不当和缺乏现代方法,几乎​​没有取得积极成果。在确定延误的根本原因方面,过去的延误研究方法也不尽人意。因此,延误仍然是一种不间断的现象。因此,进行这项研究的目的是阐明当前的延误情况,采用“病原体”方法来确定延误原因的根本原因,以期通过已知的当代方法提出减轻其延误的方法作为供应链管理(SCM)。通过的研究设计涉及三个阶段。第一阶段是确定导致延迟的因素,然后采访了至少20年经验的六位行业专家,以获取他们对此事的见识。然后,使用其他采用类似研究方法的著名研究的概念,将这些因素分为病原体和病原体子类别。第三阶段也是最后阶段涉及匹配有益的SCM工具,这些工具是从文献综述中精心选择的,有可能克服每种延迟病原体和病原体亚类。这项研究得出的概念框架全面概述了延迟因素,病原体和病原体子类别,以及通过SCM可以用来克服这些问题的可用工具。预计该框架将在未来的马来西亚公共部门建设项目中带来更好的时间管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号