首页> 外文期刊>International Journal of Integrated Engineering >Application of Queuing Theory in Analyzing the Use of Production Capacity
【24h】

Application of Queuing Theory in Analyzing the Use of Production Capacity

机译:排队论在生产能力利用分析中的应用。

获取原文
获取外文期刊封面目录资料

摘要

Queuing theory is a major topic of applied mathematics that deals with phenomenon of waiting and arises from the use of powerful mathematical analysis to describe production processes. This study examines the use of production capacity of facilities in Fujitsu Components (M) Sdn. Bhd. based on queuing theory. The aim of this study is to achieve an appropriate queuing analytical model and determine its performance measures by analyzing the capacity requirements and estimating manufacturing cycle times. Field study has been conducted in several production departments in Fujitsu Components (M) and production data has been collected through selftiming, past collected data and recorded data approach. The production processes has been simplified into seven independent series of stations, which are Stamping, Riveting, Cutting, Bending, Packing and two Inspection stations. The capacity requirement has been determined by utilization factor where the benchmark equal to one. This study then represents the data in form of queuing analytical model to analyze the performance measures. The queuing analytical model later identified that all stations having enough capacity (uj <1) to achieved the production planned with slightly higher utilization occur in stamping and riveting stations. Several suggestions have been discussed in order to improve the performance measures. Results for this study clearly show that queuing theory is very useful and practical in evaluating the capacity requirement of the production system facilities.
机译:排队论是应用数学的一个主要主题,它处理等待现象,并且源于使用强大的数学分析来描述生产过程。这项研究检查了富士通组件(马)有限公司的设施生产能力的使用。基于排队理论。这项研究的目的是通过分析容量需求和估计制造周期时间来获得合适的排队分析模型并确定其性能指标。已经在富士通Components(M)的几个生产部门中进行了实地研究,并通过自定时,过去收集的数据和记录的数据方法收集了生产数据。生产过程已简化为七个独立的工位系列,分别是冲压,铆接,切割,弯曲,包装和两个检验工位。容量需求已由利用率确定,基准等于1。然后,本研究以排队分析模型的形式表示数据,以分析绩效指标。排队分析模型随后确定,所有具有足够产能(uj <1)来实现计划的生产且利用率稍高的工作站都出现在冲压和铆接工作站中。为了改进性能指标,已经讨论了一些建议。这项研究的结果清楚地表明,排队论对于评估生产系统设施的容量需求非常有用和实用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号