...
首页> 外文期刊>International Journal of Energy Engineering >Frequency Reserve Within Unit Commitment Considering Spinning Reserve Uncertainty
【24h】

Frequency Reserve Within Unit Commitment Considering Spinning Reserve Uncertainty

机译:考虑旋转储备不确定性的单位承诺内的频率储备

获取原文
           

摘要

Various technical limitations of generating units and ancillary services requirements have more complicated the power generation control and operation. This paper introduces a novel methodology for day-ahead unit commitment, which is a crucial challenge in restructured power systems, considering primary frequency control reserve. In addition, also spinning reserve uncertainty as a practical constraint has been taken into account. In this paper, we formulate and solve simultaneous scheduling of energy and primary reserve as a mixed integer non linear programming problem that simultaneously accounts aforementioned constraints. In proposed formulation, system frequency is allowed to fall from nominal value to a critical specified limit.Finally, the proposed approach is implemented to the scheduling of a 17-unit isolated power system over 24-hours. Case studies and numerical results present significant outcomes and verify the robustness of the proposed method, while it creates a schedule consistent with the primary frequency control and spinning reserve uncertainty.
机译:发电机组的各种技术限制和辅助服务要求使发电的控制和操作更加复杂。本文介绍了一种用于提前完成机组承诺的新方法,考虑到主频率控制储备,这是重组电力系统中的关键挑战。另外,还考虑到旋转储备不确定性作为实际约束。在本文中,我们将能源和主要储备的同时调度制定和解决为混合整数非线性规划问题,同时解决了上述约束。在提出的公式中,允许系统频率从标称值下降到临界的指定极限。最后,提出的方法用于在24小时内调度17个单元的隔离式电力系统。案例研究和数值结果显示了重要的成果,并验证了所提出方法的鲁棒性,同时它创建了与主要频率控制和旋转储备不确定性相一致的时间表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号