...
首页> 外文期刊>International journal of metrology and quality engineering >Quality assurance in planning a radon measurement survey using PDCA cycle approach: what improvements?
【24h】

Quality assurance in planning a radon measurement survey using PDCA cycle approach: what improvements?

机译:使用PDCA循环方法规划ra测量调查时的质量保证:有哪些改进?

获取原文
   

获取外文期刊封面封底 >>

       

摘要

This work is focused on effectiveness of adopting the Plan, Do, Check, Act (PDCA) cycle model, also known as Deming cycle, for an analytical laboratory management. It is not uncommon for university laboratories, unlike those of private companies, to register problems and losses in the management of materials, supplies and quality of service, especially externally. The PDCA cycle is closely associated with the planning, implementation, control and continuous improvement of the processes. In this context, the Deming cycle method finds a simple and informal application in order to make small modifications and improvements to the entire Radon gas activity concentrations measurement procedure. Attention is paid to most important topics as management of equipment and materials, record maintenance, sample analysis and risk communication. The results recorded were positive in terms of material savings, job optimization, quality of results and organization of internal processes.
机译:这项工作的重点是为分析实验室管理采用计划,执行,检查,执行(PDCA)周期模型(也称为戴明周期)的有效性。与私人公司不同,大学实验室记录材料,供应和服务质量管理方面的问题和损失,尤其是在外部,这种情况并不少见。 PDCA周期与流程的计划,实施,控制和持续改进紧密相关。在这种情况下,戴明循环法找到了一种简单而非正式的应用,以便对整个Rad气活度浓度测量程序进行少量修改和改进。注意最重要的主题,例如设备和材料的管理,记录维护,样品分析和风险通报。记录的结果在材料节省,工作优化,结果质量和内部流程组织方面都是积极的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号