Lean Construction – Application of Value Stream Mapping on Infra Structure Project

机译:精益建设–价值流图在基础设施项目中的应用

获取原文
           

摘要

Value Stream Mapping (VSM) is a tool for depicting the flow of material in a manufacturing process. This study demonstrates that value stream mapping can also be applied to the movement and processing of information in Infra structure projects. Currently it takes about 40 days to cast a single slab. The value stream map shows that 7 days of this time consists of nonvalue added activity such as backlogs and waiting. Using Lean tools both valueadded and nonvalue added activities on the value stream map can be identified. The future state map shows how the process might be improved after changes are made to the process. The challenge lies in organizing the information in the VSM to remove or reduce the nonvalue added steps. There are some distinct differences between the office processes and manufacturing processes. Unlike production systems, information flows can be loosely structured and use informal scheduling, making it difficult to identify and map their values streams. However, companies can apply value stream mapping tool to office processes in the same way they use it in manufacturing.
机译:价值流图(VSM)是用于描述制造过程中物料流的工具。这项研究表明,价值流映射也可以应用于基础结构项目中信息的移动和处理。目前铸造一块板坯大约需要40天。价值流图显示,此时间的7天包括非增值活动,例如积压和等待。使用精益工具,可以识别价值流图上的增值和非增值活动。将来的状态图显示了对流程进行更改后如何改进流程。挑战在于组织VSM中的信息以删除或减少非增值步骤。办公流程和制造流程之间存在一些明显的差异。与生产系统不同,信息流可以采用松散的结构并使用非正式的调度,从而难以识别和映射其价值流。但是,公司可以将价值流映射工具应用于办公室流程,就像在制造业中使用它一样。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号