The criticality of maintenance planning in maintenance operations and by extension fleet management cannot be over-emphasized. Time study offers the much needed organizational growth in terms of effective labour utilization, methods improvement, wage calculation, task assignment and employee welfare by analyzing maintenance operations into elements that make up the entire repair work. A typical fleet management company is faced with repairing on routine the clutches of its fleet. A time study was conducted by carrying out analysis of a video recording of the repairs of the clutches of a case study municipal transport fleet. The analysis revealed that the current repair process has 15 major repair process, 124 elemental procedures of work of which; 56 were Operation; 17 were Inspection; 29 were Transportation; 0 were Storage and 22 were Delay. The current repair process sees a clutch repair to be completed in 3:34hours. However, a clutch repair process was proposed. The proposed method has 18 major repair elements, 130 elemental procedures of which; 70 is Operation; 18 is Inspection; 27 is Transportation; 4 Storage and 11 Delays. The proposed method was seen to be completed in 3:11hours and far lesser delays and increased inspection which enhance the quality of repair work. A time study of the current repair process revealed that tool and spares procurement occupied the chunk of the delays in the current repair process, it further revealed that the gearbox disassembly process amounts to greater time, energy and man-hour wastage hence, a gantry was proposed to be mounted on the bus walkway to aid the lifting-off of the gearbox. On tool and spares procurement, tools and spares were proposed to be procured firsthand before the actual repair work is commenced. This would reduce the “to and fro” movement to the store. The proposed method also factored ergonomics into its sequence of repairs by allowing rest time for fatigue, personal, standing and basic allowances as against the current process where breaks can be taken at technician’s wish.
机译:维护计划在维护操作中以及通过扩展车队管理的重要性不可过分强调。通过将维护操作分析为构成整个维修工作的要素,时间研究可提供有效的劳动力利用,方法改进,工资计算,任务分配和员工福利方面急需的组织发展。典型的车队管理公司面临着定期修理车队离合器的问题。通过对一个案例研究的市政运输车队的离合器修理录像进行分析,进行了一项时间研究。分析表明,目前的维修程序有15个主要维修程序,其中124个基本工作程序;行动56人;检查17人; 29个是运输; 0是存储,22是延迟。当前的维修过程将在3:34小时内完成离合器维修。但是,提出了离合器修理方法。所提出的方法有18个主要维修要素,其中130个基本步骤; 70为运作中; 18是检验; 27是交通; 4个存储和11个延迟。所建议的方法可以在3:11小时内完成,并且延迟时间更少,检查工作量大大增加,从而提高了维修质量。对当前维修过程的时间研究表明,工具和备件的采购占据了当前维修过程中的大部分延迟,它进一步表明,变速箱的拆卸过程浪费了更多的时间,精力和工时,因此,需要使用龙门架建议将其安装在公交人行道上以帮助提起变速箱。关于工具和备件的采购,建议在实际维修工作开始之前直接采购工具和备件。这将减少到商店的来回移动。提议的方法还通过允许休息时间来缓解疲劳,个人,站立和基本津贴,从而将人机工程学纳入其维修顺序,而目前的过程中,技术人员可以根据需要进行休息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号