首页> 外文期刊>International Journal of Construction Engineering and Management >Performance Management for Syrian Construction Projects
【24h】

Performance Management for Syrian Construction Projects

机译:叙利亚建设项目的绩效管理

获取原文
           

摘要

It has become known that project management through integrated and balanced indicators will achieve a significant improvement in the performance of such projects. Performance measurement and management is still unused as a performance improvement tool in Syrian construction projects. The aim of this paper is to examine the application of balanced, integrated, and recent performance management system in order to adopt it as a tool to measure and manage Syrian construction projects performance. Balanced score card was selected as framework for proposed performance management system, and performance goals were set for 8 key performance indicators. BSC designer (performance management software) was used to support application the all related issues concerning performance management stages (measure, store, analyze, report, and use) and balanced scorecard elements (objectives, measures, goals, initiatives). Four under construction building projects were chosen as a sample of selected company projects to examine a comprehensive application of performance management model. The proposed construction project balanced scorecard performance framework successfully demonstrated the projects overall performance which was marginal and ranged between (24.42-35.05) %, and progress towards goals which was limited; besides projects strengths and weaknesses. In conclusion, the application of the proposed framework has proved that it forms an integrated and balanced system for measuring and managing performance in term of its ability to address all performance management stages and BSC elements. This research finding is very important for performance management practitioners because the proposed methodology forms an experimented framework which helps them with smooth, balanced, and successful implementation of performance management for construction projects performance improvement.
机译:众所周知,通过综合和平衡的指标进行项目管理将大大改善此类项目的绩效。绩效评估和管理在叙利亚建设项目中仍未用作绩效改进工具。本文的目的是研究平衡,集成和最新的绩效管理系统的应用,以便将其用作衡量和管理叙利亚建设项目绩效的工具。选择平衡计分卡作为拟议绩效管理系统的框架,并为8个关键绩效指标设定了绩效目标。 BSC设计器(绩效管理软件)用于支持应用程序有关绩效管理阶段(度量,存储,分析,报告和使用)和平衡计分卡元素(目标,度量,目标,计划)的所有相关问题。选择了四个在建建筑项目作为选定公司项目的样本,以检查绩效管理模型的全面应用。拟议的建设项目平衡计分卡绩效框架成功地证明了项目的总体绩效是微不足道的,介于(24.42-35.05)%之间,并且在实现目标方面进展有限;除了项目的优点和缺点。总而言之,所提出框架的应用证明了它可以解决所有绩效管理阶段和BSC要素的能力,从而形成了一个用于衡量和管理绩效的集成且平衡的系统。这项研究发现对绩效管理从业人员非常重要,因为所提出的方法论形成了一个经过实验的框架,可以帮助他们平稳,平衡,成功地实施绩效管理以改善建筑项目的绩效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号