A Study of Time and Cost Relationship of Private Building Projects in Abuja

机译:阿布贾私人建筑项目的时间和成本关系研究

获取原文
           

摘要

Time, cost and quality targets have been identified as the main criteria for measuring the overall success of construction projects. However, previous research shows that little evidence exists of projects where these factors were successfully balanced. How then are the completion times of building projects in Abuja related to their costs? This was the research question of this research, which aimed at achieving a result that will show whether time is effectively related to cost of construction or not. The following objectives were examined: (i) computation of the expected duration of sampled building projects, (ii) determination of the differences between the actual and expected durations and (iii) derivation of an average value for time performance of sampled building projects. Time-cost relationship data for 30 completed private projects in Abuja were obtained from consultant Quantity Surveyors. Objective One was realized by calculating the expected effective duration for each project using the Ogunsemi and Jagboro (2006) model which is given as T = 168.895 + 0.491C (if C ≤ 557) or 709.66 + 0.884C (if C ? 557); where T = effective project duration in relation to a given cost from date of site possession to practical completion (in working days) and C = cost of the project (in millions of Naira). From analysis of the research data, it was found that at a given cost, private building projects in Abuja are executed within a duration that is 34% later than the required time. This represents an improvement over the 51% time overrun published in previous works. At the same time, it was found that larger building projects are more susceptible to time underrun. It was recommended that since the time-cost relationship appeared effective in reducing time overrun from 51% to 34%, this should be continuously maintained.
机译:时间,成本和质量目标已被确定为衡量建设项目总体成功程度的主要标准。但是,以前的研究表明,几乎没有证据表明可以成功平衡这些因素的项目。那么,阿布贾建筑项目的完成时间与成本如何相关?这是该研究的研究问题,旨在获得一个结果,该结果将显示时间是否与建筑成本有效相关。检查了以下目标:(i)计算采样建筑项目的预期工期,(ii)确定实际工期与预期工期之间的差异,以及(iii)推导采样建筑项目的时间绩效平均值。阿布贾30个已完成私人项目的时间成本关系数据是从咨询师数量测量师那里获得的。目标一是通过使用Ogunsemi和Jagboro(2006)模型计算每个项目的预期有效期限来实现的,模型为T = 168.895 + 0.491C(如果C≤557)或709.66 + 0.884C(如果C?557);其中T =有效项目工期,相对于从拥有场地的日期到实际完成(在工作日内)的给定成本,而C =项目成本(以百万奈拉计)。通过对研究数据的分析,发现在给定的成本下,阿布贾的私人建筑项目的执行时间比要求的时间晚34%。这比以前工作中公布的51%的时间超限有所改善。同时,人们发现大型建筑项目更容易受到时间不足的影响。建议,由于时间成本关系似乎可以有效地将时间超支从51%减少到34%,因此应继续保持这种状态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号