Developing a Decision Support System for Cost–Time Trade off in Project Management

机译:开发用于项目管理中成本-时间权衡的决策支持系统

获取原文
获取外文期刊封面目录资料

摘要

Project managers are generally requested to finish their project in a scheduled time by reducing the total cost. They can reduce the project duration by assigning more resources to the project activities. The project managers generally face a trade-off between cost and time. Some of the project activities are sometimes subcontracted to suppliers. In such cases project managers needs to evaluate project activity times and their risks, project completion time, project total cost and quality of their supplier support. In this study, a multi-attribute decision support system is proposed where activity normal and crash times are evaluated along with the supplier ranking with respect to some of their attributes.
机译:通常要求项目经理通过减少总成本在预定时间内完成项目。他们可以通过为项目活动分配更多资源来缩短项目工期。项目经理通常面临成本与时间之间的权衡。某些项目活动有时分包给供应商。在这种情况下,项目经理需要评估项目活动时间及其风险,项目完成时间,项目总成本以及供应商支持的质量。在这项研究中,提出了一种多属性决策支持系统,其中评估了正常活动时间和崩溃时间,以及关于某些属性的供应商排名。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号