首页> 外文期刊>INCAS Bulletin >Test Rig Adaptation for WT Measurements for OR&TP Configurations
【24h】

Test Rig Adaptation for WT Measurements for OR&TP Configurations

机译:针对OR&TP配置的WT测量的测试装备适配

获取原文
           

摘要

The need to test large models at maximum speed regimes close to 100 m/s, for which the aerodynamic forces and moments occurring on the model far exceed the measuring capability of the existing TEM external balance, made it necessary to design an alternative model support system installed outside the INCAS subsonic wind tunnel. This is the case of models included in the Clean Sky European programs GRA and SFWA ITD. The wingspan of these models is equal to the width of the test section. For these models, the pressure distributions on the model surface should be determined by pressure measurement through small orifices connected to scanning devices while the aerodynamic forces and moments will be obtained by integration of the pressure and shear stress distributions. To this purpose a model support system was designed which is not attached to the external balance but to the steel structure of the tunnel located outside the experimental room.
机译:需要以接近100 m / s的最大速度测试大型模型,模型上出现的空气动力和力矩远远超过现有TEM外部天平的测量能力,因此有必要设计替代模型支持系统安装在INCAS亚音速风洞的外部。这就是Clean Sky欧洲计划GRA和SFWA ITD中包含的模型的情况。这些模型的翼展等于测试部分的宽度。对于这些模型,应通过连接到扫描装置的小孔口进行压力测量来确定模型表面上的压力分布,同时通过对压力和切应力分布进行积分来获得空气动力和力矩。为此,设计了一个模型支撑系统,该系统不附加到外部天平,而是附加到位于实验室外部的隧道的钢结构上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号