Design Process to Reduce Production Cycle Time in Product Development

机译:缩短产品开发周期的设计流程

获取原文
           

摘要

In today’s business climate, the old adage “time is money” has been expanded to mean that time is competitive weapon. Today customer’s demands are quick delivery and good quality at reasonable price. When entering the global market the companies encounter several difficulties, the most important one being excessive time for new product development. Thus to perform in a global market, short lead times are essential to provide customer satisfaction. Lead time in manufacturer point of view is the time elapse between placing of an order and the receipt of goods ordered. There are various components of lead time such as setup time, process time, move time and waiting time. This paper deals with review of various tools and techniques to reduce lead time. This problem can be solved by transition from sequential engineering to concurrent engineering, A survey of published works in the field of designing teams in big companies has revealed that in big companies a three-level team structure is recommended, as well as a workgroup, consisting of four basic teams. Method study techniques use to examine current way of work and develop effective method base on elimination, combining, changing and simplification of activities. Various lean tools such as Single Minute Exchange of Dies (SMED), 5S, Poka-yoke, Kanban, Just-in-time (JIT), Value Stream Mapping (VSM), Jidoka, Cellular manufacturing etc. helps in reducing lead time. Also Manufacturing Resource Planning (MRPII), Theory of Constraints (TOC) classic approaches of Production Planning and Control (PPC) are use to reduce Work in Process (WIP) and flow time.
机译:在当今的商业环境中,古老的格言“时间就是金钱”已经扩大,意味着时间是竞争武器。如今,客户的需求是交货迅速,质量好,价格合理。当进入全球市场时,公司会遇到一些困难,最重要的是过多的时间用于新产品的开发。因此,要在全球市场上取得成功,短交货期对于提高客户满意度至关重要。从制造商的角度来看,提前期是指从下订单到收到所订购商品之间的时间。提前期有很多组成部分,例如准备时间,处理时间,移动时间和等待时间。本文讨论了减少交货时间的各种工具和技术。通过从顺序工程过渡到并行工程可以解决此问题。对大公司设计团队领域中已发表作品的调查显示,在大公司中,建议使用三级团队结构,并建议一个工作组,其中包括四个基本团队。方法研究技术用于检查当前的工作方式,并在消除,组合,更改和简化活动的基础上开发有效的方法。各种精益工具,例如单分钟换模(SMED),5S,Poka-yoke,看板,即时(JIT),价值流图(VSM),Jidoka,蜂窝制造等,都有助于缩短交货时间。此外,还使用制造资源计划(MRPII),约束理论(TOC)生产计划与控制(PPC)的经典方法来减少在制品(WIP)和流程时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号