CAUSES AND EFFECTS OF DELAYS IN LARGE CONSTRUCTION PROJECTS OF PAKISTAN

机译:巴基斯坦大型建筑项目延误的原因和影响

获取原文
   

获取外文期刊封面封底 >>

       

摘要

The construction delay is a main problem in large construction industry of Pakistan. Large construction industry is very important for the development, economy and progress of Pakistan. In research methodology, we conducted a questionnaire survey to get data about the causes of delay and effects of delay. We asked the clients, contractors and constructions by questionnaire and we took interviews of labor to fill questionnaire about causes and effects of delay. To analyze the data, we applied a statistical formula to calculate the RIR value for importance of causes and effects. We used RIR values to rank the causes and effects. Then we discussed the sixteen important causes, five main effects of delay and related the effects with the main relating causes. Later, we described some main large construction projects in Pakistan and the delay affecting these projects. At the end, we suggested some solutions to counter delays by solving or 18 Kuwait Chapter of Arabian Journal of Business and Management Review Vol. 1, No.4; December 2011 lessening the causes and effects of delays. By these solutions, the delays in Pakistan’s large construction industry can be alleviated.
机译:施工延误是巴基斯坦大型建筑业的主要问题。大型建筑业对巴基斯坦的发展,经济和进步至关重要。在研究方法中,我们进行了问卷调查以获取有关延迟原因和延迟影响的数据。我们通过问卷调查询问客户,承包商和建筑,并进行了劳动访谈以填写有关延误原因和影响的问卷调查。为了分析数据,我们应用了统计公式来计算因果关系重要性的RIR值。我们使用RIR值对因果进行排序。然后我们讨论了十六个重要原因,五个主要的延迟影响,并将这些影响与主要相关原因相关联。后来,我们描述了巴基斯坦的一些主要大型建筑项目以及对这些项目造成的延误。最后,我们提出了一些解决延迟的解决方案,方法是解决《阿拉伯企业管理杂志》第18卷的第18科威特章。 1号4号2011年12月,减少了延误的原因和影响。通过这些解决方案,可以缓解巴基斯坦大型建筑业的拖延。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号