首页> 外文期刊>American Journal of Traffic and Transportation Engineering >Research on Bus Priority Control on Non-coordinated Phase Based on Transmodeler--A Case Study of Changjiang Road in Huangdao District of Qingdao
【24h】

Research on Bus Priority Control on Non-coordinated Phase Based on Transmodeler--A Case Study of Changjiang Road in Huangdao District of Qingdao

机译:基于Transmodeler的非协调相位公交优先控制研究-以青岛市黄岛区长江路为例。

获取原文
       

摘要

Many studies focus only on the bus priority request on coordinated- phase in traffic signal coordination of artery, while ignoring the bus priority control on non-coordinated phases. For the non-coordinated phases with more bus traffic, it is necessary to achieve bus priority control on non-coordinated phases. Based on the coordinated control on artery and bus priority control on the coordinated phase, this paper put forward the control principle of bus priority on the non-coordinated phases for active early turning on and lately breaking green light and the calculation method of the green time on each phase with the limitation of upper and lower limits of the green belt and the minimum green time of every phase. This paper took the Changjiang Road in Huangdao District of Qingdao as an example, and established the existing signal control scheme of Changjiang Road in Transmodeler. After that, we input bus priority control principle on the non-coordinated phases and algorithm put forward in this paper into the simulation software system. Then, two traffic flow conditions were respectively simulated before and after implementing bus priority on the non-coordinated phases of the traffic signal on the Changjiang Road. Finally, the output evaluation index of each intersection signal on two conditions were compared and analyzed. The results showed that the proposed control principle and algorithm could reduce the traffic delay and improve the efficiency of road operation effectively.
机译:许多研究只关注动脉交通信号协调中协调相位的总线优先级请求,而忽略了非协调相位的总线优先级控制。对于总线流量较大的非协调阶段,有必要在非协调阶段实现总线优先级控制。基于对动脉的协调控制和协调阶段的公交优先控制,提出了主动提前开通和迟开绿灯的非协调阶段的公交优先控制原则和绿灯时间的计算方法。在每个阶段都有绿带上限和下限的限制以及每个阶段的最短绿色时间。本文以青岛市黄岛区长江路为例,建立了现有的Transmodeler长江路信号控制方案。然后,将非协调阶段的总线优先级控制原理和算法输入到仿真软件系统中。然后,分别在长江路交通信号非协调阶段对公交优先实施前后,分别模拟了两种交通状况。最后,比较和分析了两种情况下每个交叉口信号的输出评价指标。结果表明,所提出的控制原理和算法可以减少交通延误,有效提高道路运营效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号