首页> 外文期刊>American Journal of Management Science and Engineering >Project Management Practice in Groundwater Construction Project in Ghana
【24h】

Project Management Practice in Groundwater Construction Project in Ghana

机译:加纳地下水建设项目的项目管理实践

获取原文
       

摘要

The implementation of good project management practice effectively, is a way of improving future projects especially in groundwater construction projects. The lack of good project management principles may cause project delays, and higher costs. A fundamental principle of project management is that any project, regardless of its size or type, consists of three components: scope, budget, and schedule. The purpose of this paper is to investigate and examine how project Management practice in groundwater construction projects in Ghana. The research focuses on the issues of management practice in groundwater construction projects in order to recommend ways of improving management practices. The data were collected through a questionnaire survey sent to the managers, consultants and client's representative who had been involved in the construction of groundwater projects in Ghana. The survey covered the project management lifecycle: project initiation, planning, executing, monitoring/controlling the closing/evaluating processes of the project. The result of the data analysis reveals that: all three groups (managers, consultant and clients representative) generally agreed that most of the problems in the groundwater construction projects are human and management related. Furthermore, the results indicated that most of the projects did not have project management processes and procedures. The paper concludes with recommendations that the scope of the project is defined and a project management plan is developed be taken in the early stages (conceptual and planning, and evaluating phases) of the groundwater construction projects.
机译:有效实施良好的项目管理规范,是改善未来项目的一种方法,尤其是在地下水建设项目中。缺乏良好的项目管理原则可能会导致项目延误和更高的成本。项目管理的基本原则是,任何项目,无论其大小或类型如何,均由三部分组成:范围,预算和进度。本文的目的是调查和研究加纳地下水建设项目中的项目管理实践。该研究集中于地下水建设项目中的管理实践问题,以提出改进管理实践的方法。数据是通过问卷调查收集的,该问卷已发送给参与加纳地下水项目建设的管理人员,顾问和客户代表。该调查涵盖了项目管理生命周期:项目启动,计划,执行,监视/控制项目的结束/评估过程。数据分析的结果表明:所有三个小组(经理,顾问和客户代表)都普遍认为,地下水建设项目中的大多数问题与人为和管理有关。此外,结果表明大多数项目没有项目管理过程和程序。本文最后提出建议,确定项目的范围,并在地下水建设项目的早期阶段(概念,规划和评估阶段)制定项目管理计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号