首页> 美国卫生研究院文献>other >Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry
【2h】

Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry

机译:利用项目绩效评估建筑业质量管理体系维护和实践的有效性

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings.
机译:本文提出了七个现有和新的绩效指标,以衡量建筑业质量管理体系(QMS)维护和实践的有效性。这项研究是基于基于QMS变量的问卷进行的,该变量是从文献回顾中提取的,以及根据项目管理理论建立的项目绩效指标。使用相关和回归分析对收集的数据进行分析。调查结果表明,客户满意度和时间差异与质量管理系统具有正向和显着的关系,而其他项目绩效指标则没有显示显着的结果。进一步的研究可以使用相同的项目绩效指标来研究QMS在不同采样区域的有效性,以提高调查结果的推广性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号