Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study

机译:发展中国家地下水项目建设延误的原因和费用超支;加纳案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

Delay and cost overruns are common in construction projects and groundwater construction projects in Ghana are not an exception. The paper presents the results of a questionnaire survey conducted to identify and evaluate the relative importance of the significant factors contributing to delay and cost overruns in Ghana groundwater construction projects. Respondents of this survey included personnel from owners, consultants and contractors involved in groundwater projects in Ghana. The results of the study revealed the main causes of delay and cost overruns in construction of groundwater projects included: monthly payment difficulties from agencies; poor contractor management; material procurement; poor technical performances; and escalation of material prices. Hence, effective project planning, controlling and monitoring should be established to enhance project performance in order to minimise or avoid delay and cost problems in groundwater construction projects.
机译:延期和成本超支在建筑项目中很常见,加纳的地下水建设项目也不例外。本文介绍了一项问卷调查的结果,该调查旨在识别和评估导致加纳地下水建设项目延误和成本超支的重要因素的相对重要性。这项调查的参与者包括加纳地下水项目的业主,顾问和承包商的人员。研究结果表明,造成地下水项目建设延迟和费用超支的主要原因包括:机构每月付款困难;承包商管理不善;物料采购;技术性能差;和物价上涨。因此,应建立有效的项目计划,控制和监控措施,以提高项目绩效,以最大程度地减少或避免地下水建设项目中的延误和成本问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号