Overtopping breach peak outflow approximation of embankment dam by using Monte Carlo method

机译:蒙特卡洛法对路堤大坝顶破突峰流量的近似

获取原文
           

摘要

The main goal of this paper is to develop an empirical relationship for estimating the peak outflow discharge of embankment dam breach due to overtopping flow. The main controlling parameter in the previously developed relationships is the reservoir volume behind the embankment dam. These relationships assumed that the whole reservoir volume becomes empty during the failure process and the area under the outflow hydrograph curve is equal to this volume. Conducted large scale physical models recorded that a remaining vertical head-cut in the upstream side of the embankment dam maintained even after the final breach formation. That means, the previously depended upon assumption is not true especially for embankments constructed from cohesive soils. The newly developed relationship accounts for the remaining vertical head-cut and the spelled overtopping flow. The Monte Carlo method was employed to calculate the area under the flow duration curve and consequently the development of the new formula. The new relationship gave more accurate results and reasonable outcomes as compared to actual previous case sttudies measured breach peak outflow discharges and the results obtained using previously developed formulae.
机译:本文的主要目的是建立一种经验关系,以估算由于过顶水流引起的堤坝溃坝的最大流出量。先前建立的关系中的主要控制参数是堤坝后面的储层体积。这些关系假设整个油藏体积在破坏过程中变空并且流出水文曲线下方的面积等于该体积。进行的大规模物理模型记录表明,即使在最终的裂缝形成后,堤坝上游侧仍保留了垂直的竖向切口。这就是说,以前依靠的假设是不正确的,特别是对于由粘性土壤建造的路堤。新开发的关系解决了剩余的垂直头切和拼写过的顶流。蒙特卡罗方法被用来计算流动持续时间曲线下的面积,因此开发了新的公式。与实际的先前案例研究相比,新的关系给出了更准确的结果和合理的结果,这些案例研究测量的突破峰值流出流量以及使用先前开发的公式获得的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号