首页> 外文期刊>African Journal of Business Management >Measuring readiness for successful information technology/information system (IT/IS) project implementation: A conceptual model
【24h】

Measuring readiness for successful information technology/information system (IT/IS) project implementation: A conceptual model

机译:衡量成功的信息技术/信息系统(IT / IS)项目实施的准备情况:概念模型

获取原文
       

摘要

Many investigation have shown that the introduction of new investment in information technology/ information system (IT/IS) are profoundly affecting the processes, work environment, structures and strategies of an organization. This is due to the fact that new IT/IS will lies in changing the people system or better known as ‘soft issue’. The resistance to change might occur due to lack of creating a sense of need and urgency for change among the employee and consequently might lead to the IT/IS project failure. Therefore, to reduce the resistance to change among the employee, it is essential that an organisation needs to determine the level of readiness for change prior the introduction of new IT/IS implementation by measuring its internal capabilities. A failure to assess organisational readiness prior the IT/IS implementation may result in mangers spending more time dealing with the resistance to change or even worst may result in IT/IS failure. To date most of the traditional IT/IS performance measures are based on productivity and process, which focus mainly on method of investment appraisal and become obsolete and suffered with a many problem. Furthermore, majority of current IT/IS performance measure approaches are mainly post-investment measures which fail to address the readiness issues. On top of that, there are constantly lacks of understanding of the human and organisational issue in the current IT/IS measurement approaches. Those approaches also lack holistic perspective on IT/IS which unable to describe the complex impacts within organizations. Therefore, this paper will address the issue of organisation readiness prior IT/IS implementation. A proposed IT/IS maturity model is developed as an attempt to address the problem issues with current IT/IS measurement approaches. This model has been designed to measure the capability of organisation to “successfully implement IT systems” and it is applicable across industries. The idea is to provide managers with measurement tools to enable them to identify where improvements are required within their organisation and to indicate their readiness prior to IT investment. This model investigates four organisational key elements: IT, environment, process and people, and is composed of six progressive stages of maturity that a company can achieve its IT/IS capabilities.
机译:许多调查表明,对信息技术/信息系统(IT / IS)的新投资的引入正在深刻影响组织的流程,工作环境,结构和策略。这是因为,新的IT / IS将在于改变人员系统或更好地称为“软问题”。由于缺乏对员工进行变更的需求感和紧迫感,可能会产生变更阻力,因此可能导致IT / IS项目失败。因此,为减少员工对变更的抵制,组织必须在引入新的IT / IS实施之前通过衡量其内部能力来确定变更的准备程度。在IT / IS实施之前无法评估组织的准备情况可能会导致管理人员花费更多的时间来应对变更的抵制,甚至可能导致IT / IS失败。迄今为止,大多数传统的IT / IS绩效度量都是基于生产力和过程的,这些度量主要集中在投资评估的方法上,变得过时并且存在许多问题。此外,当前大多数IT / IS绩效衡量方法主要是投资后措施,无法解决准备问题。最重要的是,在当前的IT / IS度量方法中,人们始终缺乏对人与组织问题的理解。这些方法也缺乏对IT / IS的整体看法,无法描述组织内部的复杂影响。因此,本文将解决在IT / IS实施之前组织准备就绪的问题。开发提议的IT ​​/ IS成熟度模型是为了尝试解决当前IT / IS测量方法中的问题。该模型旨在衡量组织“成功实施IT系统”的能力,并且适用于整个行业。这个想法是为管理人员提供度量工具,使他们能够确定组织内需要改进的地方,并在IT投资之前表明他们的准备情况。该模型调查了四个组织关键要素:IT,环境,流程和人员,并且由公司可以实现其IT / IS功能的六个成熟的渐进阶段组成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号