首页> 外文期刊>Civil Engineering and Architecture >The Development of BIM Model-based Construction Project Performance Evaluation Mechanism
【24h】

The Development of BIM Model-based Construction Project Performance Evaluation Mechanism

机译:基于BIM模型的建设项目绩效评价机制的开发

获取原文
           

摘要

In construction industries, performance evaluation is used as a systematic way of judging project performance. However, it is still a daunting task for project managers to accurately and timely record of the current status on the site due to the project's dynamic nature. In addition, there is no effective mechanism available yet to integrate information among all the project participants. In view of this, a construction project performance evaluation mechanism based on BIM model will be proposed in this research. Firstly, a systematic analysis will be conducted to analyze the current process and structure of the evaluation of construction projects. Based on existing IFC/BIM, the current IFC data structure will be extended accordingly and BIM graphic objects will be created to describe project information. Using graphic objects to describe relative project information, they form a reliable resource for project performance evaluation. Finally, the construction project performance evaluation mechanism will be developed to verify the feasibility of the proposed approach.
机译:在建筑行业中,绩效评估被用作判断项目绩效的系统方法。但是,由于项目的动态性质,对于项目经理来说,准确,及时地记录现场的当前状态仍然是一项艰巨的任务。此外,尚无有效的机制可以在所有项目参与者之间整合信息。有鉴于此,本研究提出了一种基于BIM模型的建设项目绩效评价机制。首先,将进行系统的分析,以分析建设项目评估的当前过程和结构。基于现有的IFC / BIM,将相应扩展当前的IFC数据结构,并创建BIM图形对象来描述项目信息。使用图形对象描述相对的项目信息,它们形成了用于项目绩效评估的可靠资源。最后,将开发建设项目绩效评估机制,以验证该方法的可行性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号