首页> 外文期刊>Design Products and Applications >A specifier's guide to fasteners and fixings
【24h】

A specifier's guide to fasteners and fixings

机译:紧固件和固定装置的规范指南

获取原文
获取原文并翻译 | 示例
       

摘要

Specifying fasteners and fixings correctly the first-time round is critical in ensuring the fastening system remains robust throughout the lifetime of the roofing system or building envelope. However, fasteners are often not specified until Stage 4 in the RIBA plan of work - when the fastening system has already been determined. It's often up to contractors to price the work, and they can end up cutting corners with the fasteners and fixings. By engaging higher up in the build process chain, the correct fasten- ers are matched to perform with the fastening system and the material it is securing, as well as the substrate that the fastener is securing down to -improving the total cost of ownership and efficiency of the system.
机译:首次正确指定紧固件和固定装置对于确保紧固系统在屋面系统或建筑物围护结构的整个生命周期内保持坚固至关重要。但是,直到RIBA工作计划的第4阶段(通常已经确定了紧固系统)时,才通常不指定紧固件。通常由承包商来为工程定价,他们最终可能会用紧固件和固定装置偷工减料。通过在构建过程链中占据较高的位置,可以匹配正确的紧固件,以与紧固系统及其所要固定的材料以及紧固件所要固定的基材配合使用,从而降低了总体拥有成本和系统的效率。

著录项

  • 来源
    《Design Products and Applications》 |2020年第4期|18-20|共3页
  • 作者

  • 作者单位

    SFS Group;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号