Architect's Authority to Order Minor Changes during Construction

机译:建筑师授权在施工期间下令进行小改动

获取原文
获取原文并翻译 | 示例

摘要

Contractors generally accept that minor changes in the work will probably have to be made during construction even with the best of drawings and specifications. Some refining adjustments must generally be made to smooth out imperfections in the documents or the construction. When it is done properly, most contractors find this to be only a trivial inconvenience. Architects are concerned that the contract documents be faithfully executed and that unconsidered deviations initiated by others do not escape the architect's oversight and control. Even though the owner has ultimate authority, architects are understandably uncomfortable with the concept of an Owner making even minor changes in the contract or design directly with the contractor without the architect's involvement. Some, usually neophyte, owners might not realize that the architect's administration of the contract and guardianship of the integrity of the design concept could be quickly reduced to a state of confusion, inefficiency, and ineffectiveness.
机译:承包商普遍认为,即使有最好的图纸和规格,也可能必须在施工期间对工程进行细微的改动。通常必须进行一些调整,以消除文件或结构中的瑕疵。如果做得正确,大多数承包商会发现这只是一个小麻烦。建筑师担心合同文件得到了忠实的执行,而他人提出的未考虑到的偏差也无法逃脱建筑师的监督和控制。即使所有者拥有最终的权力,建筑师对所有者的概念感到不舒服,这是可以理解的,即所有者在没有建筑师参与的情况下直接与承包商进行了很小的合同或设计变更。一些通常是新手的所有者可能没有意识到,建筑师对合同的管理和对设计概念完整性的监护可以迅速减少到混乱,低效和无效的状态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号