...
首页> 外文期刊>Defense Daily >House Defense Bill Adds Over $1 Billion In Unfunded Navy Priorities
【24h】

House Defense Bill Adds Over $1 Billion In Unfunded Navy Priorities

机译:众议院国防法案增加了超过10亿美元的未获资助的海军优先任务

获取原文
获取原文并翻译 | 示例

摘要

The House Armed Services Committee’s (HASC) FY 2020 defense authorization bill adds over $1 billion in Navy funds from the unfunded priorities list, according to the chairman’s mark. The majority of Navy unfunded list projects from HASC Chairman Adam Smith’s (D-Wash.) mark consists of $814 million for submarine maintenance funding shortfalls. This is specifically tied to $290 million for the Los Angeles-class USS Boise (SSN-764), $306 million for the USS Hartford (SSN-768), and $57 million for the USS Columbus (SSN-762). The Boise has been a focus for congressional attention in the submarine maintenance backlog. SSN-764 was first scheduled to enter the Norfolk Naval Shipyard in 2013 but is now due to receive maintenance work at Huntington Ingalls Industries’ [HII] Newport News shipyard in FY ’20
机译:主席的话说,众议院武装委员会(HASC)的2020财年国防授权法案从未资助的优先事项清单中增加了10亿美元的海军资金。 HASC主席亚当·史密斯(D-Wash。)标记的海军大部分未资助清单项目包括8.14亿美元的潜水艇维修资金缺口。洛杉矶级的“博伊西”号(SSN-764)为2.9亿美元,哈特福德号(SSN-768)为3.06亿美元,哥伦布号(SSN-762)为5700万美元。博伊西一直是海底维修积压工作中引起国会关注的焦点。 SSN-764最初计划于2013年进入诺福克海军造船厂,但现在定于20财年在Huntington Ingalls Industries的[HII]纽波特纽斯造船厂接受维护工作

著录项

  • 来源
    《Defense Daily》 |2019年第11期|11-12|共2页
  • 作者

    Rich Abott;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号