...
首页> 外文期刊>Dallas Semiconductor Maxim Engineering Journal >How do Dallas Semiconductor delay lines work?
【24h】

How do Dallas Semiconductor delay lines work?

机译:达拉斯半导体延迟线如何工作?

获取原文
获取原文并翻译 | 示例
           

摘要

In the early 1980s, Dallas Semiconductor was the first company to develop the all-silicon delay line (Figure 1). These ICs provided a smaller, more cost-effective alternative to the modular delay lines used at the time. The first Dallas delay lines consisted of an RC-based ramp generator and a comparator circuit that transitioned the delay line output when it reached a certain voltage level on the ramp generator. Calibration was performed at the factory at wafer level by using a laser to blow a series of fuses until the desired delay was achieved. There was limited provision for temperature compensation.
机译:在1980年代初期,达拉斯半导体公司是第一家开发全硅延迟线的公司(图1)。这些IC为当时使用的模块化延迟线提供了更小,更具成本效益的替代方案。达拉斯的第一条延迟线包括一个基于RC的斜坡发生器和一个比较器电路,当延迟线输出达到斜坡发生器上的某个电压电平时,该比较器电路会转换延迟线输出。校准是在工厂进行的,在晶圆级使用激光吹动一系列保险丝,直到达到所需的延迟。温度补偿的规定有限。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号