首页> 外文期刊>Cost engineering >The Contractor's Role in Building Cost Reduction After Design (Bringing a Project Into Budget)
【24h】

The Contractor's Role in Building Cost Reduction After Design (Bringing a Project Into Budget)

机译:承包商在设计后降低建筑成本中的作用(将项目纳入预算)

获取原文
获取原文并翻译 | 示例
           

摘要

Having a building project fully designed, let out for bids, and then discovering the low bid is over budget, can be an extremely discouraging experience for an owner. It can also be costly for a building contractor to spend the time and effort required to submit a bid and not have the project awarded because of over budget issues. Many projects have been successfully brought into budget through negotiations between owners and building contractors after design. The intent of this article is to stimulate contractors, owners, and design teams to work together to find acceptable cost saving solutions and alternatives to bring projects into budget. This paper examines some of the avenues building contractors can use to reduce project cost. The use of value engineering, scope reduction, and scope deferral are methods that are discussed. The importance of the building contractor establishing a relationship with owners and design teams based on trust and openness is also discussed. Emphasis is placed on examining the various components and systems within a building project through the work breakdown structure (WBS). Three different types of building projects that were successfully brought into budget through this process are also illustrated. With the continued growth in construction activity and inflationary pressures in most regions of the country, the incidence of building projects coming in over budget is not expected to cease. Owners are not limited to abandoning their projects or costly redesigns. In many cases, project cost can be lowered through careful analysis of building components and systems by the building contractor working with the design team. The increased value that could be gained if this cost review process was performed in the early stages of the design is recommended for future research.
机译:对于业主来说,完全设计一个建筑项目,招标,然后发现低价超出预算,可能会给业主带来极大的挫败感。对于建筑承包商来说,花费过多的时间和精力进行投标也可能会花费很大,因为预算超支而没有中标该项目。设计后,业主与建筑承包商之间的谈判已将许多项目成功地纳入预算。本文的目的是激发承包商,业主和设计团队共同努力,找到可以接受的节省成本的解决方案和替代方案,以使项目进入预算。本文研究了建筑承包商可以用来降低项目成本的一些途径。价值工程的使用,范围缩小和范围延迟是讨论的方法。还讨论了建筑承包商基于信任和开放性与业主和设计团队建立关系的重要性。重点放在通过工作分解结构(WBS)检查建筑项目中的各种组件和系统。还说明了通过此过程成功纳入预算的三种不同类型的建筑项目。随着该国大多数地区建筑活动的持续增长和通货膨胀压力,超出预算的建筑项目的发生预计不会停止。业主不仅限于放弃他们的项目或进行昂贵的重新设计。在许多情况下,可以由建筑承包商与设计团队合作,通过仔细分析建筑组件和系统来降低项目成本。建议在设计的早期阶段执行此成本审查过程可以增加价值,以供将来研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号