首页> 外文期刊>Construction News >Pinnacle faces demolition trial
【24h】

Pinnacle faces demolition trial

机译:品尼高面临拆迁审判

获取原文
获取原文并翻译 | 示例
           

摘要

A key route in the City of London will be closed this Saturday to remove a giant concrete bar as part of the demolition work at the site of the planned 288 m high Pinnacle office block. The 250 tonne bar will have to be cut into 3 m sections, each of which will be removed by a 31 m tower crane. Bishopsgate is being shut to allow lorries to carry out the concrete. Keltbray is doing demolition work which is being project managed by Mace. A spokesman for Pinnacle One, the company in charge of building the tower for developer Arab Investments, said: "Organising a road closure is an enormous amount of work.
机译:伦敦市的一条主要路线将在本周六关闭,以拆除巨型混凝土钢筋,这是计划中的288 m高的Pinnacle办公大楼所在地的拆除工作的一部分。 250吨的钢筋必须切成3 m的截面,每个截面都将由31 m的塔式起重机拆除。 Bishopsgate被关闭以允许卡车进行混凝土。凯尔特布雷(Keltbray)正在进行拆除工作,该拆除工作由梅斯(Mace)管理。负责为开发商阿拉伯投资公司(Arab Investments)建造塔楼的公司Pinnacle One的发言人说:“组织道路封闭是一项艰巨的工作。

著录项

  • 来源
    《Construction News》 |2007年第7046期|p.12|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号