...
首页> 外文期刊>Building >Pinnacle demolition continues
【24h】

Pinnacle demolition continues

机译:顶峰拆除继续

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Demolition work at the £500m Pinnacle in the City of London will not be affected by a High Court injunction setting limits to the vibration caused. The court imposed the injunction after insurance firm Hiscox, which occupies a neighbouring building, complained about disruption. Arab Investments, which is developing the 300m-high project, said it was working within levels set out in an agreement in December. These were included in the court order. However, if it does exceed levels, it will be protected if it can show it tried to prevent a breach.
机译:伦敦金融城耗资5亿英镑的Pinnacle的拆除工作不会受到高等法院禁令对振动造成的限制的影响。占用邻近建筑物的保险公司Hiscox抱怨破坏后,法院下达了禁令。正在开发这个3亿高项目的阿拉伯投资公司(Arab Investments)表示,它正在12月份达成的协议规定的水平内开展工作。这些都包括在法院命令中。但是,如果确实超过了级别,则可以证明它试图防止破坏,它将受到保护。

著录项

  • 来源
    《Building》 |2008年第8514期|p.11|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号