首页> 外文期刊>Construction News >Doyle edging closer to signing key concrete contract on Shard
【24h】

Doyle edging closer to signing key concrete contract on Shard

机译:Doyle正在接近在Shard上签署关键混凝土合同

获取原文
获取原文并翻译 | 示例
           

摘要

Concrete firm John Doyle has been appointed to carry out value engineering on the Shard of Glass building in London. Contractors for this package and the M&E work have still not been finalised by the Teigh-more consortium which is behind the 310 m-high tower. The firm has been carrying out value engineering on the job for a while but it was only formally appointed to the work last week. Doyle's contract is believed to last until the end of August and the firm will carry out the work alongside project manager Turner & Townsend and cost consultant Davis Langdon.
机译:混凝土公司John Doyle已被任命对伦敦的Shard of Glass建筑进行价值工程。 310 M高塔楼背后的Teigh-more财团尚未最终确定此包裹和M&E工作的承包商。该公司已经在工作中进行价值工程了一段时间,但直到上周才正式被任命为该工作。相信Doyle的合同将持续到8月底,该公司将与项目经理Turner&Townsend和成本顾问Davis Langdon一起进行这项工作。

著录项

  • 来源
    《Construction News》 |2008年第7080期|p.8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号