In a bid to cut waste on its construction schemes the National Offender Management Service decided to use Winchester as a pilot scheme for a project management system.rnDrawn up by specialist company Lean Thinking, the lean construction project management tool focuses on a scheme's critical path, stripping out any time that may have been placed in the programme as a contingency. This is then replaced with extra time at the end of the programme. In effect the time becomes a bonus rather than a goal.rn"What the lean construction system does," says Mr Booton, "is it takes out the contingency fat in the middle of the programme andrnputs it at the end. It concentrates on the start and end date of the critical path."rnTime consultants scrutinised Wates' design and developed a tightened and streamlined ideal programme. This includes a buffer zone at the end of the project that is updated to indicate how much of this has been eroded on a day to day basis. The system allows site staff to keep a tight control of the programme.
机译:为了减少建设计划的浪费,美国国家罪犯管理服务局决定将Winchester用作项目管理系统的试点计划。由专业公司Lean Thinking绘制的精益建设项目管理工具着眼于计划的关键路径,剔除可能在程序中放置的任何时间,以备不时之需。然后在计划结束时将其替换为额外的时间。实际上,时间变成了奖励,而不是目标。rn“ Boon先生说,“精益施工系统的作用是,它在计划的中间消除了应急费用,并最终将其投入。关键时刻的开始和结束日期。”时间顾问仔细审查了Wates的设计并制定了严格且精简的理想计划。这包括在项目结束时的缓冲区,该缓冲区已更新以指示每天其中有多少缓冲区已被侵蚀。该系统使现场工作人员可以严格控制程序。

著录项

  • 来源
    《Construction News》 |2009年第7101期|21-21|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号