Temporary works satety locus is key in Olympic delivery year

机译:临时工程安全所在地是奥运交付年的关键

获取原文
获取原文并翻译 | 示例
           

摘要

With the Olympics requiring a much higher number of temporary structures to be designed and erected in 2012, the industry needs to ensure lessons are learnt from the recent spate of international collapses. Unlike the construction sector, where temporary works such as access, formwork, falsework and ground shoring have been governec by stiff design guidelines and when design, installation, inspection and use are controlled by temporary works co-ordinators, the temporar; structures sector has to date not been regulated as closely.
机译:奥运会要求在2012年设计和建造更多的临时建筑物,因此,汽车行业需要确保从最近的国际崩溃中吸取教训。与建筑部门不同,在建筑部门,严格的设计准则对准入,模板,脚手架和地面支撑等临时工程进行了管治,而当设计,安装,检查和使用由临时工程协调员(即临时工)控制时,则应如此;迄今为止,建筑行业尚未受到严格的监管。

著录项

  • 来源
    《Construction News》 |2012年第7253期|p.26|共1页
  • 作者

    IAN FRYER;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号