...
首页> 外文期刊>Construction News >Detailed planning approvals
【24h】

Detailed planning approvals

机译:详细的计划批准

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Education approvals went from strength to strength in Scotland in the four months from July to Ocotber on the same period a year earlier. Health recovered from a weak start to 2013 and estimates suggest its approvals were up for the year overall. Offices also made up for a poor first half of 2013 during the period, which should help its approvals for the year as a whole match 2012's total, although these figures are still down sharply on 2011. Private housing held steady over the four months but is expected to have ended the year down slightly on 2012.
机译:在苏格兰,从去年7月到Ocotber的四个月里,教育批准的力度与去年同期相比越来越大。卫生状况从疲弱的开端恢复到2013年,据估计,该年度的整体批准量有所增加。在此期间,办公室也弥补了2013年上半年的不景气,这将有助于其整个年度的批准,与2012年的总和相匹配,尽管这些数字仍比2011年大幅下降。私人住房在四个月中保持稳定,但预计今年年底将比2012年略有下降。

著录项

  • 来源
    《Construction News》 |2014年第7338期|36-36|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号