首页> 外文期刊>Construction News >Go Construct? Go further to challenge perceptions
【24h】

Go Construct? Go further to challenge perceptions

机译:去构造?进一步挑战观念

获取原文
获取原文并翻译 | 示例
           

摘要

Many of the problems facing contractors and clients come down to one thing: a shortage of skilled staff. For the second year in a row, annual industry performance data reveals that fewer than half -40 per cent - of UK construction projects are being completed on time (see pages 2-3 and 28-32). It's a sobering proportion - and, depressingly, even lower than last year, when 45 per cent of projects were completed on time. The skills shortage is certainly a factor. The annual data, compiled by construction intelligence provider Glenigan along with the CITB, Constructing Excellence and the Department for Business, Innovation and Skills, is provided by the industry for the industry. It is expressly for benchmarking and enabling contractors to improve their performance.
机译:承包商和客户面临的许多问题归结为一件事:缺乏熟练的员工。连续第二年,年度行业绩效数据显示,不到一半的-40%的英国建筑项目按时完成(请参阅第2-3和28-32页)。这是一个发人深省的比例,而且令人沮丧的是,甚至比去年少,当时按时完成了45%的项目。技能短缺无疑是一个因素。由建筑情报提供商Glenigan以及CITB,Constructioning Excellence和商业,创新与技能部共同编制的年度数据由行业提供。它明确用于基准测试和使承包商能够提高绩效。

著录项

  • 来源
    《Construction News》 |2015年第7415期|1416|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号