首页> 外文期刊>Construction News >Offsite tonic speeds cancer care at Guy's
【24h】

Offsite tonic speeds cancer care at Guy's

机译:异地滋补加快了Guy's的癌症治疗速度

获取原文
获取原文并翻译 | 示例
           

摘要

London Bridge is currently one of the most logistically challenging locations to deliver a construction project in the country. Aside from the narrow streets clogged with the capital's traffic, there are several major building jobs running concurrently. These include Network Rail's Thameslink upgrade at London Bridge station, the ongoing fit-out of the Shard, and a new £160m cancer centre at Guy's Hospital. The location has shaped the approach of the project team delivering the new 14-storey Guy's Hospital Cancer Centre. Main contractor Laing O'Rourke has used its design for manufacture and assembly processes as widely as possible to reduce insitu building work.
机译:伦敦桥目前是在该国交付建设项目中最具物流挑战的地点之一。除了狭窄的街道被首都的交通堵塞之外,还有一些主要的建筑工作同时进行。其中包括Network Rail在伦敦桥车站进行的Thameslink升级,正在进行的Shard装修以及在盖伊医院新建的1.6亿英镑癌症中心。该地点改变了项目团队提供新的14层盖伊医院癌症中心的方法。总承包商Laing O'Rourke已将其设计尽可能广泛地用于制造和装配过程,以减少现场建筑工作。

著录项

  • 来源
    《Construction News》 |2015年第7399期|20-22|共3页
  • 作者

    WILL MANN;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号