首页> 外文期刊>Construction News >Counters Creek sewer on Crossrail 2 collision course
【24h】

Counters Creek sewer on Crossrail 2 collision course

机译:在Crossrail 2碰撞路线上对付Creek下水道

获取原文
获取原文并翻译 | 示例
           

摘要

Plans by Thames Water to build a major sewer in London could face delay if the safeguarding on a Crossrail 2 route is not removed by the government. The preferred route for Thames Water's Counters Creek project is understood to affect one of Crossrail 2's safeguarded routes. The Counters Creek flooding alleviation scheme is Thames Water's biggest project after its Thames Tideway Tunnel super sewer. The scheme is designed to reduce the risk of sewer flooding for more than 1,700 basement properties in Hammersmith & Fulham and Kensington & Chelsea.
机译:如果政府不取消对Crossrail 2路线的保护,泰晤士水务公司在伦敦建造大型下水道的计划可能会面临延误。泰晤士水公司的Counters Creek项目的首选路线被认为会影响Crossrail 2的受保护路线之一。 Counters Creek防洪计划是继Thames Tideway隧道超级下水道之后的泰晤士水务公司最大的项目。该计划旨在减少Hammersmith&Fulham和Kensington&Chelsea的1,700多个地下室的下水道泛滥的风险。

著录项

  • 来源
    《Construction News》 |2015年第7390期|6-7|共2页
  • 作者

    ROBYN WILSON;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号