...
首页> 外文期刊>Construction News >Mace chosen for next phase of Olympic regen
【24h】

Mace chosen for next phase of Olympic regen

机译:梅斯被选为下一阶段的奥林匹克复兴

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Mace has been chosen to build the next phase of the East Village residential development near the Olympic Park. The contract covers the second phase of the transformation of the London 2012 Athletes' Village into a new residential neighbourhood. The company will build two towers measuring 30 and 26 storeys high. Collectively they will include 482 homes and be completed in 2018. East Village is part of the wider regeneration of the Queen Elizabeth Olympic Park, which will ultimately create a series of new neighbourhoods in east London, delivering 7,000 homes.
机译:梅斯已被选中在奥林匹克公园附近建造东村住宅开发的下一阶段。该合同涵盖将2012年伦敦奥运会运动员村改造为新的居民区的第二阶段。该公司将建造两座高30和26层的塔楼。它们总共将包括482栋房屋,并于2018年完工。East Village是伊丽莎白女王奥林匹克公园更广泛复兴的一部分,该公园最终将在伦敦东部创建一系列新的社区,提供7,000栋房屋。

著录项

  • 来源
    《Construction News》 |2016年第7436期|10-10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号