首页> 外文期刊>Construction News >Precast steps forward
【24h】

Precast steps forward

机译:预制步骤向前

获取原文
获取原文并翻译 | 示例
           

摘要

Cornish Concrete Products has designed, supplied and installed two feature staircases for a new 9,350 sq m four-storey office building at BP's International Centre for Business and Technology at Sunbury-on-Thames. Working from an outline design of the staircase by Buro Happold, Cornish Concrete Products' engineers carried out the detailed design of the individual precast elements and connections. During this process, the proposed in situ concrete solution was switched to precast to achieve the required finish and quality. All precast elements cantilever from a curved central spine beam, which is partly reinforced with 25 mm solid steel plate.
机译:康沃尔混凝土产品公司为位于泰晤士河畔桑伯里的BP国际商务和技术中心的一栋新的9350平方米的四层办公楼设计,提供和安装了两个功能楼梯。康沃尔混凝土制品公司的工程师根据Buro Happold的楼梯轮廓设计,对各个预制构件和连接件进行了详细设计。在此过程中,将拟议的现场混凝土解决方案转换为预制件,以达到所需的光洁度和质量。所有预制构件均来自弯曲的中央脊梁,该梁的一部分用25 mm实心钢板加固。

著录项

  • 来源
    《Construction News》 |2017年第7473appa期|24-24|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号