Elite Precast has played an integral role in safeguarding the iconic Settle and Carlisle railway line. The line, which is also a strategic through-route for Network Rail, runs through the Yorkshire Dales National Park. The surrounding countryside is bleak, rugged, beautiful and wet - sometimes very wet. A consequence of that high annual rainfall is that the Settle and Carlisle line has suffered from drainage issues since it was constructed in the 1870s.
展开▼
机译:Elite Precast在维护标志性的Settle和Carlisle铁路线上起着不可或缺的作用。这条线路也是约克郡河谷国家公园(Network York Rail Dales National Park)的战略路线。周围的乡村阴暗,崎,美丽而潮湿-有时非常潮湿。每年降雨量很高的结果是,自1870年代建造以来,定居和卡莱尔线一直存在排水问题。
展开▼