首页> 外文期刊>Construction News >HS2 chief: 'Best not cheapest' is driving project's procurement
【24h】

HS2 chief: 'Best not cheapest' is driving project's procurement

机译:HS2负责人:“最好不便宜”正在推动项目的采购

获取原文
获取原文并翻译 | 示例
           

摘要

HS2's chief operating officer has defended the rail project's procurement strategy and rejected an assertion that it had hired firms based on cost alone. At a conference last week, Richard Robinson said the project had been seeking the best team, not the cheapest. Earlier this year, US engineering giant Bechtel launched a High Court claim over the award of the £lbn Old Oak Common contract to a Balfour Beatty / Vinci Construction UK / Vinci Grands Projets / Systra (BVVS) joint venture. Legal papers showed that it was the top-rated bid on price, but not for quality.
机译:HS2的首席运营官为铁路项目的采购策略辩护,并拒绝了它仅根据成本聘请公司的说法。理查德·罗宾逊(Richard Robinson)在上周的一次会议上说,该项目一直在寻找最好的团队,而不是最便宜的团队。今年早些时候,美国工程巨头贝克特尔(Bechtel)向高等法院提起诉讼,要求其将英磅的Old Oak Common合同授予Balfour Beatty / Vinci Construction UK / Vinci Grands Projets / Systra(BVVS)合资企业。法律文件显示,这是价格最高的出价,但不是质量最高的出价。

著录项

  • 来源
    《Construction News》 |2019年第7562期|7-7|共1页
  • 作者

    MILES ROWLAND;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号